We have been
working day and night for several months, facing serious weather obstacles,
political difficulties and spiritual battles and without reservation we know
God has worked them all out.
On our 60th
trip in we hosted a team of professional builders from South Carolina which
moved us over half way to the completion of our final church construction
project . We were able to finish the excavation and site work, we are close to
finishing the 12 24ft concrete columns, we began placing the first EPS foam
panels, put the finishing touches on a large septic system, laid the
foundation, prepared the baptistery, did the plumbing, installed the electricity
and began pouring the floor on the 5,000 square foot structure.
It is difficult many times to single out church or individual contributions because there are so
many that make what we do possible but I must say thank you to Pastor Monroe,
Mike, Robert, Ted, Rick and the entire congregation of Florence Baptist Temple
for the blessing they have been to our ministry.
Top of columns being poured
Tom, Robert, Ted and Rick in the Morning
Finishing Septic System Plan
Tom planning the Baptistry
Beginning the Floor
Moving along even at Night